Built, flashed and burned in — before it ships.
We design our boards and build our displays and finished devices in our own factory. Firmware is loaded on the line and every batch runs a continuous burn-in of one to two days — so what arrives is ready to deploy.
Six steps between your design and your doorstep.
-
01Board and system design
Schematics, layout and mechanical design by our two hardware teams. Boards and modules are checked on test fixtures before final assembly.
-
02PCBA and assembly
We own the board design and production files; SMT runs on qualified partner lines under our engineering control. Boards, panels, touch sensors and enclosures are assembled in our factory.
-
03Production line
Large-format signage, kiosks and touch displays are built on the same line — from samples and pilot runs to mass production.
-
04Firmware loading and configuration
Your custom image, boot logo, preinstalled apps and default settings are flashed on the line, so devices boot straight into your product.
-
05Burn-in testing
Finished units run continuously for one to two days on our aging racks before shipping.
-
06Inspection and packing
Final checks, then packing and shipping from our own warehouse.
Fifty times the floor space in nine years.
Each expansion followed demand — from streaming boxes to signage, kiosks and AI devices.
Small batches or volume rollouts — same line, same team.
Minimum quantities depend on how much is customised. Firmware can keep changing at every stage, and after launch we keep maintaining your build.
- Samples
Engineering samples for your testing.
- Pilot run
A small run proves build, firmware loading and burn-in.
- Mass production
Firmware on the line, one-to-two-day burn-in, packing.
- After launch
Firmware updates, OTA and successor boards.



Factory questions
Do you have your own factory?
Yes — a 3,095 m² factory in Longgang, Shenzhen, where we assemble, configure and test our devices.
Can you install our software or firmware before shipping?
Yes. Your firmware image, apps, boot logo and settings are loaded on the production line, so devices are ready when they arrive.
How long is the burn-in test?
One to two days of continuous operation on our aging racks before the units ship.
Do you run your own SMT line?
We design the boards and own the production files; SMT is done on qualified partner lines, and we assemble, load firmware and test in our own factory.
Can we visit the factory?
Yes — in person in Shenzhen, or by live video tour of the production line.
What certifications do your products have?
Our quality management system is certified to ISO 9001:2015. Finished devices carry CE (RED) and RoHS certification, and FCC for the US market, issued model by model by accredited labs — the full list is on our company page. Tell us where your devices will be sold and we will confirm what applies.